Phone: +91-80-2843 7870 | Email: info@trinitycoating.com
1. PRETREATMENT AND ED - Hot water spray rinse, Dip degrease, No. 1 dip & spray rinse, Dip conditioning, Dip zinc phosphate, No. 2 pray rinse, No. 3 dip rinse, No. 4 spray rinse, DI spray rinse, E-coat dip stage, No. 1 UF dip rinse, No. 2 UF dip rinse, DI water rinse.
2. ED NIGHT STORAGE AREA
3. PVC BOOTH - PVC under coat spraying system
4. FENDER FITTING
5. OFF LINE REPAIR
6. SEALER LINE - Sealer circulation line (dead end system)
7. PRIMER NIGHT STORAGE AREA
8. TWO TONE MASKING
9. PRIMER / TOP COAT BOOTH & AMU - Robots, Paint circulation system (Main & mini circulation system)
10. MOISTURE / PRIMER BOOTH
11. FINAL INSPECTION
12. WAX / BLACKOUT BOOTH - Wax circulation system
13. OFFLINE REPAIR
1. AIR MAKE UP UNIT
2. PREPARATION ZONE
3. PRIMER BOOTH
4. BASE COAT BOOTH
5. CLEAR COAT BOOTH
6. SETTING ZONE
7. OVEN WITH CONVEYOR
8. OTHER WORKING AREA
9. PAINT MIX ROOM
1. AIR MAKE UP UNIT
2. PREPARATION ZONE
3. PRIMER BOOTH
4. SETTING-1
5. BASE COAT BOOTH
6. SETTING-2
7. CLEAR COAT BOOTH
8. SETTING-3
9. OVEN
10. OTHER WORKING AREA
11. PAINT MIX ROOM
12. PAINT CIRCULATION SYSTEM
1. PRETREATMENT & ED LINE - Dip degreasing, Dip water rinse, Dip surface conditioning, Dip phosphate, Dip DI water rinse, ED, UF1 rinse, DI water rinse
2. BAKING OVEN
3. DI WATER PLANT
4. CHILLER SYSTEM FOR ED
5. 6 TON BOILER SYSTEM
1. PAINT BOOTHS
2. AIR MAKE-UP UNIT
3. OVEN WITH HEATING SYSTEM
4. OTHER WORKING AREAS
1. TOP COAT PAINT BOOTHS / OVENS
2. BUMPER SHOP PAINT BOOTHS AND OVENS
3. PTED CAPACITY EXPANSION PROJECTS